Deployment Plan: New Project to K3s with CI/CD
Project Discovery Phase
1. Application Architecture Questions
Critical Questions to Answer:
-
What type of application is this?
- Frontend (React/Vue/Angular/Next.js)?
- Backend (Django/FastAPI/Node.js/Go)?
- Monolith or microservices?
- Static site or full-stack?
-
What are the runtime requirements?
- Programming language and version?
- Build tools needed?
- Runtime dependencies?
- Environment variables required?
-
Does it have a Dockerfile already?
- If yes: Does it follow best practices (multi-stage build, non-root user)?
- If no: We'll create one following your infrastructure patterns
-
What external services does it depend on?
- Database (PostgreSQL/MySQL/MongoDB)?
- Cache (Redis/Memcached)?
- Message queue (RabbitMQ/Kafka)?
- Search engine (Elasticsearch)?
- Object storage (S3/SeaweedFS)?
- Email service?
-
What are the data persistence requirements?
- Application data (database)?
- User uploads (S3-compatible)?
- Static files (can be served from SeaweedFS)?
- Logs (ephemeral or need retention)?
Infrastructure Assessment
2. Current Infrastructure Alignment
Based on Your Existing Setup:
✅ Available Infrastructure:
- Harbor registry at harbor.abrino.cloud (with SotoonTech organization)
- SeaweedFS S3 at s3.abrino.cloud (8333 endpoint)
- K3s 6-node HA cluster with NFS storage
- MetalLB for LoadBalancer services (20.0.50.0/24 pool)
- ingress-nginx for internal routing
- Traefik (external) for SSL termination and domain routing
- Headscale VPN (20.0.0.0/24) for developer access
- GitHub Actions runners connected to your cluster
Questions to Determine Resource Allocation:
-
What domain/subdomain should this application use?
- Format:
[subdomain].abrino.cloud - Need SSL certificate (Let's Encrypt via Traefik)
- Format:
-
What are the expected resource requirements?
- CPU: Small (0.5 core), Medium (1-2 cores), Large (4+ cores)?
- Memory: Small (<512Mi), Medium (512Mi-2Gi), Large (2Gi+)?
- Replicas: 1 for dev, 2+ for production HA?
-
Storage requirements?
- Database size estimate?
- User upload volume?
- Backup frequency needed?
Deployment Strategy
3. Container Image Strategy
Following Vitrown-back Pattern:
Decision Tree:
1. Does Dockerfile exist?
└─ Yes → Review and optimize (multi-stage, security, caching)
└─ No → Create new Dockerfile based on language/framework
2. Image naming convention:
harbor.abrino.cloud/[organization]/[project-name]:[tag]
Example: harbor.abrino.cloud/sotoontech/new-project:latest
Dockerfile Checklist (will be created/reviewed):
- Multi-stage build for smaller final image
- Non-root user for security
- Proper layer caching (COPY requirements first, then code)
- Health check endpoint defined
- Production-ready settings (no debug mode)
- Static files handling strategy
4. Kubernetes Manifests Strategy
Required Manifests (following your infrastructure patterns):
k8s/
├── namespace.yaml # Dedicated namespace for the project
├── configmap.yaml # Non-sensitive configuration
├── secret.yaml # Sensitive data (DB credentials, API keys)
├── deployment.yaml # Application pods
├── service.yaml # ClusterIP service
├── ingress.yaml # ingress-nginx rules
├── pvc.yaml # NFS storage claims (if needed)
└── [database-specific].yaml # PostgreSQL/Redis StatefulSets if needed
Questions for Manifest Configuration:
-
Database deployment approach?
- Use existing PostgreSQL in cluster (shared instance)?
- Deploy dedicated PostgreSQL StatefulSet for this project?
- Use external managed database?
-
Configuration management approach?
- Environment variables via ConfigMap/Secret?
- Configuration files mounted as volumes?
- External configuration service?
-
Scaling requirements?
- Fixed replica count or HorizontalPodAutoscaler?
- Resource limits appropriate for the workload?
5. CI/CD Pipeline Strategy
GitHub Actions Workflow Pattern (based on Vitrown-back success):
Pipeline Stages:
1. Trigger: Push to main/develop branch or PR merge
2. Build: Docker image with caching
3. Test: Run unit/integration tests in container
4. Push: To Harbor registry
5. Deploy: Update K3s deployment
6. Notify: NTFY notification on success/failure
Questions for CI/CD Configuration:
-
Branch strategy?
- main → production deployment
- develop → staging deployment
- feature/* → no auto-deploy?
-
Testing requirements?
- Unit tests to run?
- Integration tests?
- Test database needed?
-
Deployment strategy?
- Rolling update (zero downtime)?
- Blue-green deployment?
- Canary deployment?
-
Notification preferences?
- NTFY topic for this project?
- Success and failure notifications?
- Slack/Discord integration needed?
Security & Access Control
6. Security Considerations
Questions:
-
Authentication requirements?
- Public application (no auth)?
- Internal only (Headscale VPN access)?
- OAuth/OIDC integration?
- API key authentication?
-
Secrets management?
- What sensitive data needs to be stored?
- Database credentials?
- API keys for third-party services?
- SSL/TLS certificates (handled by Traefik)?
-
Network policies?
- Restrict pod-to-pod communication?
- Database access only from app pods?
- External API access requirements?
Migration & Data Strategy
7. Data Migration (if applicable)
Questions:
-
Is there existing data to migrate?
- From where (Docker Compose setup, another cluster, cloud)?
- Database dump available?
- User uploads/files to transfer?
-
Migration approach?
- One-time migration before go-live?
- Gradual migration with sync period?
- Parallel run before cutover?
Monitoring & Maintenance
8. Operational Considerations
Questions:
-
Monitoring requirements?
- Application metrics (Prometheus)?
- Logging aggregation needed?
- APM (Application Performance Monitoring)?
-
Backup strategy?
- Database backup frequency?
- Retention policy (following your minimal approach)?
- S3/SeaweedFS data backup?
-
Update/rollback procedures?
- Manual approval for production deploys?
- Automatic rollback on failure?
- Health check requirements?
Implementation Phases
Phase 1: Project Analysis (Current Phase)
- Answer all discovery questions above
- Review existing codebase structure
- Identify dependencies and services
- Determine resource requirements
Phase 2: Containerization
- Create/optimize Dockerfile
- Build and test image locally
- Push to Harbor registry
- Verify image works in isolated environment
Phase 3: Kubernetes Configuration
- Create namespace and resource quotas
- Generate ConfigMaps and Secrets
- Create deployment manifests
- Configure services and ingress
- Set up persistent storage (if needed)
Phase 4: Database Setup (if needed)
- Deploy database StatefulSet or use existing
- Initialize schema/migrations
- Configure backups
- Test connectivity from application pods
Phase 5: CI/CD Pipeline
- Create GitHub Actions workflow
- Configure Harbor credentials in GitHub Secrets
- Set up kubectl access to K3s cluster
- Test build and deployment process
- Configure NTFY notifications
Phase 6: Testing & Validation
- Deploy to staging environment first
- Run smoke tests
- Performance testing
- Security scanning
- Load testing (if applicable)
Phase 7: Production Deployment
- Final configuration review
- Deploy to production namespace
- Configure Traefik ingress for domain
- SSL certificate verification
- Monitor first deployment closely
Phase 8: Documentation
- Deployment procedure documentation
- Troubleshooting guide
- Rollback procedures
- Developer onboarding (Headscale access)
- Add to team Obsidian knowledge base
Risk Assessment
Potential Issues to Watch:
-
Resource Constraints:
- Monitor abr-1 server resources (CPU/RAM/Storage)
- Ensure NFS performance adequate for workload
- MetalLB IP pool availability
-
Network Configuration:
- Ensure proper routing through Traefik → ingress-nginx → service
- Headscale VPN access for developers
- External service connectivity (if needed)
-
Data Persistence:
- NFS mount reliability
- SeaweedFS bucket configuration and permissions
- Database backup validation
-
CI/CD Reliability:
- GitHub Actions runner availability
- Harbor registry storage capacity
- Network connectivity during deployments
Next Steps
To proceed, I need you to:
-
Share Project Information:
- GitHub repository URL (if private, grant access)
- Project type (frontend/backend/fullstack)
- Programming language/framework
- Current development setup (Docker Compose, local dev, etc.)
-
Answer Critical Questions:
- Domain name preference:
?????.abrino.cloud - Database requirements (new or shared PostgreSQL?)
- Expected user load and resource needs
- Target deployment environment (production only or staging + production?)
- Domain name preference:
-
Provide Access Information:
- Harbor organization (create new or use existing?)
- GitHub repository access for setting up Actions
- NTFY topic preference for notifications
Once I have this information, we'll proceed step-by-step through each implementation phase, following the same systematic approach that successfully deployed Vitrown-back with <5 minute deployment times.
Expected Timeline
Estimated Time Per Phase:
- Phase 1 (Discovery): 30 minutes - 1 hour
- Phase 2 (Containerization): 1-2 hours
- Phase 3 (K8s Configuration): 2-3 hours
- Phase 4 (Database Setup): 1-2 hours (if needed)
- Phase 5 (CI/CD Pipeline): 2-3 hours
- Phase 6 (Testing): 2-4 hours
- Phase 7 (Production Deploy): 1 hour
- Phase 8 (Documentation): 1-2 hours
Total: 1-2 days for a complete, production-ready deployment with CI/CD.
Success Criteria
We'll know we're successful when:
- ✅ Developer pushes code → GitHub Actions builds → Harbor stores image → K3s deploys → Application accessible
- ✅ Deployment time < 5 minutes (matching Vitrown-back performance)
- ✅ Application accessible via HTTPS at assigned domain
- ✅ Health checks passing
- ✅ NTFY notifications working
- ✅ Rollback procedure tested and documented
- ✅ Team can access via Headscale VPN for development
- ✅ Documentation added to Obsidian knowledge base
Let's start with Phase 1. Please provide the project details and answer the critical questions above.